Adexsi fits out Kensington’s tallest residential tower in decades
375 Kensington High St is a seven-building site which features Edward House – 17 storeys of sheer luxury
Whole Life FM – Maintenance & Repair Solutions
Brise Soleil, Solar Shading & Architectural Louvres
Photovoltaic & Solar Power Systems
Smoke & Heat Exhaust Ventilation Systems (SHEV’s)
375 Kensington High St is a seven-building site which features Edward House – 17 storeys of sheer luxury
Adexsi UK has been called on to provide a complete suite of fire, smoke and ventilation solutions for
Adexsi’s Veripower fire safety systems have been specified for Amazon’s new offices at Principal Place. The substantial office
Adexsi UK is providing key building safety elements for Great Portland Estates’ redevelopment of the former Post Office
The Winter Garden is becoming an increasingly fashionable building accessory. Adexsi’s Rob Davies explains the attraction. The concept
Adexsi UK is supplying a range of smoke ventilation equipment for the construction of the NAS (or Nad
With Middle East demand for construction booming, the British office of Adexsi UK is increasingly designing and supplying
Adexsi, the growing specialist in smoke exhaust ventilation, air and natural lighting management, has expanded again with the
Budget grocery retailer Lidl is enjoying booming demand for its products across the UK. As well as building
The A £200 million waste to energy plant is taking shape at the Wilton International site on Teesside.
The clever Karat rooflight delivers 125% of the light of a regular rooflight, and improves ventilation. The thermal
Adexsi UK has been appointed to deliver smoke extract systems for the lift lobbies all the way up